4 Steps to Take Before Starting Demolitions

An engineer on a construction site with a safety vest on and a hard hat in his hands. He is looking at a tablet.

Bringing a building down is often more complex than putting one up. While the end result—a cleared site—seems simple, the process to get there requires surgical precision, rigorous planning, and strict adherence to safety protocols.

Rushing into the physical teardown without the necessary groundwork is a recipe for disaster. It can lead to severe legal penalties, project delays, environmental contamination, and, most critically, threats to worker and public safety. To ensure your project proceeds without incident, here are the five essential steps to take before starting demolition.

1. Conduct a Comprehensive Hazardous Material Survey

Before a single brick is removed, you must know exactly what is inside the structure. Commercial buildings, particularly those built before the 1980s, frequently contain hazardous materials that can become airborne during demolition.

A specialized environmental team should conduct a thorough audit for certain hazardous materials. This includes asbestos (found in floor tiles and roofing), lead paint, and chemical residues found in industrial factories.

If these materials are identified, they must be remediated by licensed professionals before general demolition begins. Ignoring this step violates strict environmental regulations and puts your crew at significant health risk.

2. Secure Necessary Permits and Clearances

Administrative hurdles in commercial demolition are significant. You cannot simply bulldoze a structure on your own timeline. Local, state, and federal regulations require specific documentation to ensure the work is lawful.

This goes beyond a standard demolition permit. Depending on the location and scope of the site, you may need:

  • Noise and vibration variance permits.
  • Sidewalk or lane closure permits for public safety.
  • Tree removal or protection permits.
  • Notifications to environmental agencies regarding air quality and dust control.

Failure to secure the right paperwork can result in immediate “stop work” orders and hefty fines that bleed the project budget.

3. Develop a Site Security and Safety Plan

Construction demolition sites are inherently hazardous, not just for workers but for the surrounding public. A comprehensive safety plan must be established to control access and mitigate risks.

This typically involves installing high-security fencing to prevent unauthorized entry and to contain debris. This temporary fencing improves safety on demolition sites and prevents unauthorized entries. Signage must be posted clearly to warn of danger zones.

Fire safety is also paramount. With hot work (cutting torches) often involved, having fire suppression systems available and accessible is non-negotiable.

4. Plan Your Waste Management and Salvage Strategy

Demolition generates massive amounts of waste. In modern construction, simply hauling everything to a landfill is neither cost-effective nor environmentally responsible.

A robust waste management plan identifies materials that can be salvaged or recycled, and those that must be disposed of. By separating these materials, you can significantly reduce tipping fees and lower the project’s environmental footprint.

Building the Foundation for a Safe Tear-Down

Demolition is the first step of new construction, and it sets the tone for the entire development. Following these basic steps before a demolition ensures the site is cleared efficiently and responsibly. A well-planned demolition doesn’t just remove a building; it clears the path for future success without the baggage of accidents or legal complications.